NOTICE TO UNEMPLOYMENT INSURANCE CLAIMANTS If you are filing a UI claim for the school break week and your last day of work is Friday, PLEASE FILE YOUR CLAIM ON OR AFTER SUNDAY. Filing before Sunday will cause delays with your claim.
Hoisting Engineers Hoisting Engineers operate power construction equipment that uses steam, internal combustion engines, electric or compressed air of five (5) horsepower or more and/or lift more than 500 pounds. Hoisting Engineers also use machinery to move construction materials, excavate earth and other heavy materials and to apply asphalt and concrete to roads and other structures. Hoisting Engineers operate equipment by moving levers or foot pedals, operating switches, or turning dials. The operation of much of this equipment is becoming more complex as a result of computerized controls. Hoisting Engineers may also set up and inspect equipment, make adjustments, and perform some maintenance and minor repairs. Hoisting Engineers operate hoisting or exaction equipment. Board of Examiners for Hoisting Engineers James Woloohojian - Chair James White James Grundy Kerry McGee Alexis Bacon Brian Iannuccillo Meetings All Meetings begin at 10:00 AM Meetings are held at the RI Dept. of Labor and Training 1511 Pontiac Avenue, Building 70, 2nd Floor Cranston, RI 02920 Forms Forms and Applications